Within the last week we have had drywall installed, and mudded. Siding installed in one day. Gutters installed (It only took them on hour!) and we dug a trench for the electric from the meter to the house.
We are waitng on the drywall to be sanded and the ceiling to be textured before we can get in there and paint.
Heres the pictures!
No comments:
Post a Comment