I'm not sure why my last post didn't come up when I first posted it- but it was from earlier this week...
Anywho. Today we got the rough pluming and HVAC installed which means they installed everything in the walls it just has to be hooked up. Our field manager also spray painted some items on the floor which gives is a better idea of space! Our fireplace was installed earlier this week also.
The laundry room. The box on the left will be one of those big sinks.
The kitchen! The sink is under the window and the dishwasher beside it. The stove and the fridge are on the left and the island with an eat ledge on the left side.
The dining room and living room with the fireplace :)
The toilet downstairs
Oh yeah! We got our shower/tubs too! This is the upstairs bathroom.
And the rest of the master bathroom and walk in closet in the back!
On the schedule for next week:
Singles
Windows
Electric
Well
Septic
Have a good weekend!!